top of page
SE26
![]() | ![]() |
---|---|
![]() | ![]() |
![]() | ![]() |
![]() |
Kniver Rd
Removed existing wall, exposing brick. Floated then plastered the wall. Insulated and enclosed the floorboards with fire resistant insulation and boards. Installed exterior tap. Installed cast iron radiator. Restored wooden floor. Replaced exterior down pipe, door and leaded window. End of build clean.
bottom of page